Adds R296, R299 and R300 to replays/register.go: tests in mesh-controller (TestReplay296, TestReplay299, TestReplay300, in cmd/mesh-controller/replays_test.go, added by novox/mesh-controller PR on branch replays/296-299-300, commit 7597294 as HomeRef — reachable once that PR merges with a merge commit).
Fix is each fix's merge in mesh-controller: 3808634 (#119), c37d774 (#121), e7dca6c (#122); the prover runs each on the merge's first parent and on the merge.
R296 (issue 296): PROVED — before its fix fails, on its fix passes
before: replays_test.go:364: a plan in its tier since 19:48:41, read at 20:30:00 and saved 4s before, reads "novox/mesh-catalog 3ad22356 tier 1 of 1, building for 4s"
R299 (issue 299): PROVED — before its fix fails, on its fix passes
before: replays_test.go:483: a holder serving none of a seat's optional verbs was said silent: node-catching-up's holder on laptop does not answer the bus ...
R300 (issue 300): PROVED — before its fix fails, on its fix passes
before: replays_test.go:519: the merge adding modules/systemd-resolved asked the build seat for [], not [novox/mesh-catalog modules/systemd-resolved main]
Checks: gofmt, go vet, TestEveryReplayIsWhole pass. npm test has two failures locally (listing instances/networks fails rather than reporting none) that fail identically on main on this workstation — unrelated to this change, which touches only Go.
Merge the mesh-controller PR first, so HomeRef is on its main.
Adds R296, R299 and R300 to `replays/register.go`: tests in mesh-controller (`TestReplay296`, `TestReplay299`, `TestReplay300`, in `cmd/mesh-controller/replays_test.go`, added by novox/mesh-controller PR on branch `replays/296-299-300`, commit 7597294 as `HomeRef` — reachable once that PR merges with a merge commit).
Fix is each fix's merge in mesh-controller: 3808634 (#119), c37d774 (#121), e7dca6c (#122); the prover runs each on the merge's first parent and on the merge.
```
R296 (issue 296): PROVED — before its fix fails, on its fix passes
before: replays_test.go:364: a plan in its tier since 19:48:41, read at 20:30:00 and saved 4s before, reads "novox/mesh-catalog 3ad22356 tier 1 of 1, building for 4s"
R299 (issue 299): PROVED — before its fix fails, on its fix passes
before: replays_test.go:483: a holder serving none of a seat's optional verbs was said silent: node-catching-up's holder on laptop does not answer the bus ...
R300 (issue 300): PROVED — before its fix fails, on its fix passes
before: replays_test.go:519: the merge adding modules/systemd-resolved asked the build seat for [], not [novox/mesh-catalog modules/systemd-resolved main]
```
Checks: `gofmt`, `go vet`, `TestEveryReplayIsWhole` pass. `npm test` has two failures locally (`listing instances/networks fails rather than reporting none`) that fail identically on main on this workstation — unrelated to this change, which touches only Go.
Merge the mesh-controller PR first, so HomeRef is on its main.
2026-10-07 21:44 (new) → proposed (announced): novox/mesh-lab#58's head announced
2026-10-07 21:45 proposed → checked (checked): the verdict names this commit
2026-10-07 21:45 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-07 21:55 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-07 21:55 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/mesh-lab@74c59661b1d2` — **delivered** since 2026-10-07T21:55:23Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Group** `replays/296-299-300`, in order: novox/mesh-controller@7597294ff863 → novox/mesh-lab@74c59661b1d2
**Transitions**
- 2026-10-07 21:44 (new) → proposed (announced): novox/mesh-lab#58's head announced
- 2026-10-07 21:45 proposed → checked (checked): the verdict names this commit
- 2026-10-07 21:45 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-07 21:55 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-07 21:55 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Adds R296, R299 and R300 to
replays/register.go: tests in mesh-controller (TestReplay296,TestReplay299,TestReplay300, incmd/mesh-controller/replays_test.go, added by novox/mesh-controller PR on branchreplays/296-299-300, commit 7597294 asHomeRef— reachable once that PR merges with a merge commit).Fix is each fix's merge in mesh-controller: 3808634 (#119), c37d774 (#121), e7dca6c (#122); the prover runs each on the merge's first parent and on the merge.
Checks:
gofmt,go vet,TestEveryReplayIsWholepass.npm testhas two failures locally (listing instances/networks fails rather than reporting none) that fail identically on main on this workstation — unrelated to this change, which touches only Go.Merge the mesh-controller PR first, so HomeRef is on its main.
Delivery
novox/mesh-lab@74c59661b1d2— delivered since 2026-10-07T21:55:23ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Group
replays/296-299-300, in order: novox/mesh-controller@7597294ff8 → novox/mesh-lab@74c59661b1Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.