ADR 0258: name the mesh MCP server, not the retired console #209

Merged
mesh-admin merged 1 commits from fix/needs-you-from-the-console into main 2026-10-08 13:20:45 +00:00
Contributor

#208 merged with "from the mesh console" as the words for an answer no notification can give. The glossary retires "console"; the words are now "from the mesh MCP server; this notification cannot do it.", marked as a dated progressive insight in ADR 0258 (what was decided is unchanged). Goes with novox/mesh-controller #147 (same branch name). Checks: records, index, cycle, words pass. Do not merge without the operator.

#208 merged with "from the mesh console" as the words for an answer no notification can give. The glossary retires "console"; the words are now "from the mesh MCP server; this notification cannot do it.", marked as a dated progressive insight in ADR 0258 (what was decided is unchanged). Goes with novox/mesh-controller #147 (same branch name). Checks: records, index, cycle, words pass. Do not merge without the operator.
mesh-admin added 1 commit 2026-10-08 13:03:43 +00:00
ADR 0258: name the mesh MCP server, not the retired console
mesh/merge-gate pass: the change touches no module of the mesh's graph
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group fix/needs-you-from-the-console closed: a member was closed before the group merged
39585e3bb2
The glossary retires "console"; the words an operator reads say where to act in
the mesh's own word.
Author
Contributor

Delivery novox/hq@39585e3bb2ea — delivered since 2026-10-08T13:21:10Z

Delivery plan — builds nothing: the change touches no module of the mesh's graph

Group fix/needs-you-from-the-console, in order: novox/hq@39585e3bb2 → novox/mesh-controller@2e6a9b1efc

  • composed together: pass — every machine composes with the change as it did without (4 of 4 compose)

Transitions

  • 2026-10-08 13:03 (new) → proposed (announced): novox/hq#209's head announced
  • 2026-10-08 13:04 proposed → checked (checked): the verdict names this commit
  • 2026-10-08 13:04 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
  • 2026-10-08 13:21 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
  • 2026-10-08 13:21 published → delivered (done): nothing for a walk to move

The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.

<!-- mesh-delivery:view --> **Delivery** `novox/hq@39585e3bb2ea` — **delivered** since 2026-10-08T13:21:10Z **Delivery plan** — builds nothing: the change touches no module of the mesh's graph **Group** `fix/needs-you-from-the-console`, in order: novox/hq@39585e3bb2ea → novox/mesh-controller@2e6a9b1efc05 - composed together: pass — every machine composes with the change as it did without (4 of 4 compose) **Transitions** - 2026-10-08 13:03 (new) → proposed (announced): novox/hq#209's head announced - 2026-10-08 13:04 proposed → checked (checked): the verdict names this commit - 2026-10-08 13:04 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail - 2026-10-08 13:21 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move - 2026-10-08 13:21 published → delivered (done): nothing for a walk to move The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
mesh-admin merged commit f08342ad50 into main 2026-10-08 13:20:45 +00:00
mesh-admin deleted branch fix/needs-you-from-the-console 2026-10-08 13:20:45 +00:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: novox/hq#209