#208 merged with "from the mesh console" as the words for an answer no notification can give. The glossary retires "console"; the words are now "from the mesh MCP server; this notification cannot do it.", marked as a dated progressive insight in ADR 0258 (what was decided is unchanged). Goes with novox/mesh-controller #147 (same branch name). Checks: records, index, cycle, words pass. Do not merge without the operator.
#208 merged with "from the mesh console" as the words for an answer no notification can give. The glossary retires "console"; the words are now "from the mesh MCP server; this notification cannot do it.", marked as a dated progressive insight in ADR 0258 (what was decided is unchanged). Goes with novox/mesh-controller #147 (same branch name). Checks: records, index, cycle, words pass. Do not merge without the operator.
composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
Transitions
2026-10-08 13:03 (new) → proposed (announced): novox/hq#209's head announced
2026-10-08 13:04 proposed → checked (checked): the verdict names this commit
2026-10-08 13:04 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-08 13:21 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-08 13:21 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@39585e3bb2ea` — **delivered** since 2026-10-08T13:21:10Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Group** `fix/needs-you-from-the-console`, in order: novox/hq@39585e3bb2ea → novox/mesh-controller@2e6a9b1efc05
- composed together: pass — every machine composes with the change as it did without (4 of 4 compose)
**Transitions**
- 2026-10-08 13:03 (new) → proposed (announced): novox/hq#209's head announced
- 2026-10-08 13:04 proposed → checked (checked): the verdict names this commit
- 2026-10-08 13:04 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-08 13:21 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-08 13:21 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
#208 merged with "from the mesh console" as the words for an answer no notification can give. The glossary retires "console"; the words are now "from the mesh MCP server; this notification cannot do it.", marked as a dated progressive insight in ADR 0258 (what was decided is unchanged). Goes with novox/mesh-controller #147 (same branch name). Checks: records, index, cycle, words pass. Do not merge without the operator.
Delivery
novox/hq@39585e3bb2ea— delivered since 2026-10-08T13:21:10ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Group
fix/needs-you-from-the-console, in order: novox/hq@39585e3bb2 → novox/mesh-controller@2e6a9b1efcTransitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.