Playbook 04 for design 47, after the operator confirmed the six milestones on 2026-10-17.
03-DESIGN/01-to-be/47-delivery-from-commit-to-delivered.md: the Milestones section, each with its outcome, acceptance tests, repositories and issues (973 to 981, and 971), linked depends-on in order.
03-DESIGN/00-as-is/04-delivery.md: rewritten. It described the predecessor's pipeline, which no longer runs; it now says what runs today (research 055, findings 1 to 12), which design 47 replaces milestone by milestone.
Issue 922 (the glossary and playbooks after research 055).
sh merge-check.sh passes locally.
Playbook 04 for design 47, after the operator confirmed the six milestones on 2026-10-17.
- `03-DESIGN/01-to-be/47-delivery-from-commit-to-delivered.md`: the *Milestones* section, each with its outcome, acceptance tests, repositories and issues (973 to 981, and 971), linked depends-on in order.
- `03-DESIGN/00-as-is/04-delivery.md`: rewritten. It described the predecessor's pipeline, which no longer runs; it now says what runs today (research 055, findings 1 to 12), which design 47 replaces milestone by milestone.
Issue 922 (the glossary and playbooks after research 055).
`sh merge-check.sh` passes locally.
The operator confirmed six milestones on 2026-10-17; issues 973-981 and 971
carry their repository parts, linked depends-on in order. The as-is described
the predecessor's pipeline; it now says what runs today, which design 47
replaces.
Deliverynovox/hq@748641dd22ae — delivered since 2026-10-16T22:09:56Z
Delivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
2026-10-16 22:07 (new) → proposed (announced): novox/hq#393's head announced
2026-10-16 22:08 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
2026-10-16 22:08 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
2026-10-16 22:09 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
2026-10-16 22:09 published → delivered (done): nothing for a walk to move
The commit's note under refs/notes/mesh-plan keeps every transition: git log --notes=mesh-plan.
<!-- mesh-delivery:view -->
**Delivery** `novox/hq@748641dd22ae` — **delivered** since 2026-10-16T22:09:56Z
**Delivery plan** — builds nothing: the change touches no module of the mesh's graph
**Transitions**
- 2026-10-16 22:07 (new) → proposed (announced): novox/hq#393's head announced
- 2026-10-16 22:08 proposed → checked (checked): a verdict names this commit and the trunk's head as its trunk commit
- 2026-10-16 22:08 checked → ready (accepted): the gate passed or warned, and the repository's own check did not fail
- 2026-10-16 22:09 ready → published (merged): on the trunk its modules follow: merged there, and its walk opened — or nothing for a walk to move
- 2026-10-16 22:09 published → delivered (done): nothing for a walk to move
The commit's note under `refs/notes/mesh-plan` keeps every transition: `git log --notes=mesh-plan`.
Reviewed by review-393@shanks: Round 2: all three findings fixed (as-is says rollouts run one at a time, playbook 07 names Telegram with issue 953 for the terminal, 976 depends on 975); milestones match issues and acceptance tests; merge-check passes. Marked through mesh-delivery.mark-ready (novox/hq issue 913).
ready at 748641dd22ae25cdb041181873e8c5f4f7c525e6
Reviewed by review-393@shanks: Round 2: all three findings fixed (as-is says rollouts run one at a time, playbook 07 names Telegram with issue 953 for the terminal, 976 depends on 975); milestones match issues and acceptance tests; merge-check passes. Marked through mesh-delivery.mark-ready (novox/hq issue 913).
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Playbook 04 for design 47, after the operator confirmed the six milestones on 2026-10-17.
03-DESIGN/01-to-be/47-delivery-from-commit-to-delivered.md: the Milestones section, each with its outcome, acceptance tests, repositories and issues (973 to 981, and 971), linked depends-on in order.03-DESIGN/00-as-is/04-delivery.md: rewritten. It described the predecessor's pipeline, which no longer runs; it now says what runs today (research 055, findings 1 to 12), which design 47 replaces milestone by milestone.Issue 922 (the glossary and playbooks after research 055).
sh merge-check.shpasses locally.Delivery
novox/hq@748641dd22ae— delivered since 2026-10-16T22:09:56ZDelivery plan — builds nothing: the change touches no module of the mesh's graph
Transitions
The commit's note under
refs/notes/mesh-plankeeps every transition:git log --notes=mesh-plan.ready at
748641dd22Reviewed by review-393@shanks: Round 2: all three findings fixed (as-is says rollouts run one at a time, playbook 07 names Telegram with issue 953 for the terminal, 976 depends on 975); milestones match issues and acceptance tests; merge-check passes. Marked through mesh-delivery.mark-ready (novox/hq issue 913).