Design 47's milestones and issues, and the as-is delivery as it runs today #393

Merged
mesh-tools merged 3 commits from handoff/47-milestones into main 2026-10-16 22:09:56 +00:00
3 Commits
Author SHA1 Message Date
jschoubben 748641dd22 Review of #393: rollouts run one at a time today (issue 525); Approve on Telegram (issue 953 for the terminal); 976's place in the order; milestone 1 takes the rest of 525 and acceptance test 9
mesh/merge-gate head 748641dd22ae merged into trunk 73b9cc3257a1 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 748641dd22ae merged into trunk 73b9cc3257a1 — pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-17 00:06:59 +02:00
jschoubben 75d3ac0f82 Playbooks 04 and 07 after research 055: a milestone's shape from what-if; the Approve on every merge into main; when the two-step exception ends (issue 922)
mesh/merge-gate head 75d3ac0f8258 merged into trunk 73b9cc3257a1 — pass: the change touches no module of the mesh's graph
mesh/repo-check head 75d3ac0f8258 merged into trunk 73b9cc3257a1 — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
2026-10-17 00:04:48 +02:00
jschoubben b6a191d0a6 Design 47's milestones and issues (playbook 04), and the as-is delivery rewritten from research 055's findings
mesh/merge-gate head b6a191d0a6dc merged into trunk 73b9cc3257a1 — pass: the change touches no module of the mesh's graph
mesh/repo-check head b6a191d0a6dc merged into trunk 73b9cc3257a1 — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The operator confirmed six milestones on 2026-10-17; issues 973-981 and 971
carry their repository parts, linked depends-on in order. The as-is described
the predecessor's pipeline; it now says what runs today, which design 47
replaces.
2026-10-17 00:04:00 +02:00