mesh/merge-gate head 05576db018a4 merged into trunk a688dcff394b — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A delivery plan made while another walk built a module reads it whole and names it; the walk, cut later,
finds none of the changed files in the build source that build recorded and moves nothing. Its record named
no module, so mesh-delivery read 'matched what runs' as 'never built', stopped the delivery and asked the
operator about a change already on every machine. The walk now says each such module in delivery.unchanged,
with why; its modules keep meaning what it builds.
The fix (#174, hq ADR 0266 §7) refuses an outcome built from a repository other than the module's
registered one; nothing replayed the photo app's outage that showed why. The replay uses only what
the controller had before the fix, so the prover can show it fails there and passes on the fix.
mesh/merge-gate head 6eea92c323f4 merged into trunk e0d69ab7a05b — pass: builds build-agent → ace, g14, novox, shanks; no bus step; every machine composes …
mesh/delivery covered: a later merge that contains it was delivered: novox/mesh-controller@ef3e5ae9b0dc (merged as cd6757f1 into main, walk plan-17918675…
The replay holds the operator's acceptance: a build sent after the resolver
stopped answering is not put back for that fault, and a restarted engine's
undecided statement does not forget it. Written only with what the controller
had before mesh-controller #179, so mesh-lab's prover lays it over the commit
before: it fails there and passes on the fix and on main.
The resolver's manifest test took either binding until the catalogue's main
bound once; mesh-catalog #161 (105cc7c0) did, so bind-dynamic is refused.
Since ADR 0276 the earlier merge waits in a queued batch with no modules, and the
replay skipped it, so its pass on main proved nothing. The replay now ends the
later merge's walk and has another repository's merge heard, which cuts the batch,
and fails on any plan of the two merges left standing with nothing planned.
Two catalogue merges acted on in reverse order left the fixed module planned at
the commit without the fix. The replay uses only what the controller had before
Listed among the store tests, so a check without a database cannot pass its skip.
mesh/merge-gate head 3275a16bebbb merged into trunk 584ee991961c — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A module with a trusted mergeable file had its whole layer refused through the
settings verb, because such a file took any key. Once a module's files name the
keys they take (ADR 0326), each file takes only those, so only a trusted file's
named keys are the terminal's: betterbird's tags, in a file nothing trusts, is set
through the verb, while its accounts and identities stay the terminal's or the
operator's warrant. A module whose files name no keys keeps the whole-layer rule.
mesh/merge-gate head a641ed7d15c7 merged into trunk b12c4b82e820 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
With npm-package-registry optional, the binding file the agent's environment
names may be absent, and mesh-builder failed every build on reading it. It now
reads the genesis document the installer seals at genesis's packages step when
no binding is present, prefers the binding when both are, and each build's log
says which it resolved from (§4). A build that needs the registry - a package,
an image naming .npmrc, TypeScript with an @novox/ dependency - on an agent with
neither is refused before anything is built or published, naming the machine,
the unbound requirement and gitea (§6); it never falls back to the public
registry. The captured catalogue moves to the mesh-catalog change it is judged
with.
The settings verb took the agent module's managed settings and an empty
runtime configuration's url from any caller. The replay uses only what the
controller had before #172, so mesh-lab's prover can show it fails there.
Making every soft dependency a provision made it hard: a mesh without influxdb could not assign
grafana, and one with influxdb in its catalogue would install it for grafana. A requirement may now
be written {"name": ..., "optional": true}. It resolves as a hard one when a provider is assigned or
reachable, and is otherwise absent: never refused, nothing installed for it. Its binding, credential
and only-when-bound files are left out, its ${bound:...|default:...} placeholders take their
defaults, the module check refuses one that could render empty, and plan and node list it unbound.
mesh/merge-gate head 18221c4079d1 merged into trunk 7b2a9eae8020 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
ParseManifest also reads stored builds again: a build's manifest at a
commit, the gate, a release, a module put back. betterbird's builds from
before its accounts file named its keys would have become uncomposable
there, so a send to g14 or shanks could fail and a rollback be refused.
The refusal now runs in module check, module add, a build taken in, the
builder and the merge gate's registration, and a file is no longer
reported by both §2 and §3.
mesh/merge-gate head ee1d7e5cae12 merged into trunk 56d6313262e8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The forge clips a status to 140 characters, so the long sentence pushed the
verdict's own words out; and a paused holder's hand-back or a bus delay also
count as a delivery, so the cause is not claimed (novox/hq issue 594).
A build agent replaced mid-build leaves its ask to be handed out again, and
the second run looked like a first: the queue and the pull request showed
nothing of the 5-8 minutes lost (novox/hq issue 594).
A renewal timed out at the renew interval, so the lease test's 1 s renewals
could lose the lease on a slow build machine (novox/hq issue 591, review of #279).
Reading the build events waited two seconds on every queue read, the race
detector's exit sleep cost a second per command line a test runs, and the
lease and plan-wait tests waited out production intervals (novox/hq issue 591).
The walk records its send to the rest only after every machine was sent,
which takes 20-28 s, so the machine sent first fell outside the 2 s slack,
its report was missed and the phase ended at the next walk's send to it.
Keep each machine's own send time with what it was sent, match its apply
duration by that send and digest, and show each machine's report in the
walk's phases (ADR 0282 decision 6).
Review of #276: a move deleted before it published, so a failed publish
lost an ask; a verb's own process ran a pass beside the serving one, so
one could resume the queue while the other moved asks and a build ran
twice. The copy is now published first and second copies removed by id,
asks only signal the acting controller's loop, moves stop with 5 s of
the pause left, a cancel finds a moved ask by id, and an unreadable ask
keeps its age.
mesh/merge-gate head 50c55a773eb8 merged into trunk c0c379af2b3c — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
The agent listens on nothing, so the node-engine could judge it only alive and
held it starting for the whole grace on every machine a walk moved it to. It
now writes a mark once it is bound to its worker, after its seat verbs are
served, and 'mesh-builder ready' passes only while the mark is there.
mesh/merge-gate head daf52b3aeb79 merged into trunk 4dbd4066ca54 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
A merged change's walk waited minutes on its build behind checks in a
first-come queue. The queue now hands deliveries out first, a check that
has waited ten minutes before deliveries asked after it, and says each
ask's kind; the order is kept in the work queue itself.
The fix's own TestReplay201 reads what #273 added (sendScope.puttingBack,
recordedKept's core keep, the condition), so it cannot be laid over the
commit before. TestReplay201ThePlansSend composes a plan's send to the
control node through keepingRecorded, planFor and declarationFor and holds
that it carries the controller the machine was last sent, not the older
record; it fails on 84deb53^1 and passes on 84deb53. For mesh-lab's R201
(hq issue 201).
mesh/merge-gate head b3787e4d8eb2 merged into trunk a681227af373 — pass: builds mesh-controller → novox; no bus step; every machine composes with the chang…
mesh/merge-gate head f0fd7fe8868e merged into trunk a681227af373 — fail: builds mesh-controller → novox; no bus step; head f0fd7fe8868e does not merge clea…
mesh/repo-check head f0fd7fe8868e merged into trunk a681227af373 — fail: head f0fd7fe8868e does not merge cleanly into trunk a681227af373: in conflict test…
gatedSend took its judged moves from the record, so on a machine kept at
a newer controller the gate judged the controller moving back to the
record, read its own send's kept controller as a later build there, and
was superseded with nothing judged. The kept moves are now left out
there as in ungatedIn (withoutKept). The doc says the bus step keeps
too, and the three store tests are listed.
Refusing the whole send wedged a machine whose gate put back the
controller and whose put-back send was refused: every later automatic
send there was refused, retried each tick, and held up every other walk.
A send now composes the controller and the node-engine at the build the
machine was last sent when the mesh's record is older, and carries the
rest; nothing is refused or retried, and a plan whose own build is the
older one ends with its gate superseded. A sent build that failed its
gate is never kept, so the next send completes a put-back. The condition
names the two ways out and clears on any send that carries the record,
a person's push included.
The fix's own test reads GivenOwnSecret, which the commit before does not have, so it cannot be laid over it. TestReplay401 asserts the same outcome with register, assign, planFor, declarationFor and the inventory's secret reads; it fails on 1e28342^1 and passes on main. Named in testdata/store-tests so a skip without the store fails the check. Replay for hq issue 401.
On 2026-10-02 a plan sent the control node a controller older than the one
running there, whose seat row the newer build had widened; the older binary
refused the row and the mesh went quiet for ten minutes. ADR 0185 took the
outage out of it, and the race stayed open.
Every send but a person's push now refuses a move of mesh-controller or
mesh-host to a build asked before the one its machine was last sent (the
builds' registration order, issue 219), whatever composed it — gated or not.
A gate's own put-back is the one exception, for the modules it puts back,
and says so in its send's scope. The refusal is the send's error, which the
plan keeps as its note, and a warning condition on the machine, cleared by
the next send there that carries no such move.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A head checked again through mesh-delivery reached the direct verdict with no
base head, so a head no build judges was answered with no trunk commit and the
merge tool would refuse it (novox/hq ADR 0323).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A change touching no module, in a repository with no merge-check.sh, was
answered by the controller with no trunk commit, so the merge tool refused it,
asked again and refused it for ever (novox/mesh-tools-go; novox/hq ADR 0323).