mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
cancel, clear and rebuild kept a walk's end or restart without saying it, as plans stop, retry and
release-backlog did before them. The controller's run now says every save a verb makes on the bus, so the
next verb cannot lose a mark the same way. A stop is cleared when a walk is resumed, so one that fails again
ends failed and the search for its merge runs (review 21, ADR 0308, issue 532).
plans stop|close, plans retry and upgrade release-backlog kept a walk's start or end mark without saying it,
so the router would hold what the walk touched until its bound; each now runs on the bus as plans go does.
A hand stop keeps who stopped it, so its outcome is stopped, not failed (review 15, ADR 0308, issue 532).
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A merge from any head waited for the window because the controller could not
see a group's members, so the window skip changed nothing in production and
unrelated merges walked one after another. The controller now asks
mesh-delivery's groups, within 3 s and before the plans are held: a merge
waits only when its head's group has another member whose pull request is
open and whose merge it does not keep yet (ADR 0306 §2). No answer means it
waits, and its batch says why. A headed merge in no waiting group and related
to no batch is cut at once, as one from no head is (ADR 0304 §1, ADR 0306 §3).
The controller's grant names mesh-delivery.groups. The installer's first user
list in mesh-host must carry it too before the genesis test can pass.
A merge waited the whole window even when nothing assembling shared anything
with it. It now joins only a batch it is related to (ADR 0304 §1, read by ADR
0306 §3: repository, a module the cut would move, a graph edge, a group head),
folding the newer into the oldest when it relates to two. A merge related to
none starts a batch whose window is closed at once (PlanBatch.CutAtOnce),
unless its delivery group may still have a member to merge (ADR 0306 §2).
The controller cannot see a group's unmerged members (that is mesh-delivery's
record), so a merge from any head still waits, in a batch of its own: the safe
error is to wait. Walks stay one at a time; a batch cut at once queues behind
an open walk. A stop's merges walked again join a related batch, or their own.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Every look rewrote the condition's value in the conditions bucket, because the
value carried the count of looks, the last look and the newest evidence: 131 647
writes in four days for twelve open conditions, against ADR 0289's rule that a
bucket is written only when what it describes changed. The looks now live in the
controller's store (migration 0095, condition_looks), the bucket holds what a
condition says and is written only when that changes, and the conditions verb and
the condition events put the looks back.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
ADR 0246 step 3: the systemd module, the seat's only holder, serves all three on every node,
so a holder that stops serving one is refused rather than leaving a node without them.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A registration asked the forge while node-tools re-served after a tool-runner
rollout, heard "nothing serves gitea.gitea_api", and failed a good build's
plan. The bus's not-served answer is now link.ErrNothingServes (and a timeout
link.ErrNoAnswer), and the registration asks again for up to 90 s on those
alone, never on a refusal; past the bound it fails saying how long it waited.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The bus left the controller out of the caller-named grants, so issued could never reach plex's tool; the
controller is now granted exactly the tools of offers whose software issues the credential, composed from
the records, so the installer's first user list is unchanged. A pair remade on a key change or accepted by
hand kept the issued stamp and was never sealed again; those writes now clear it.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
ADR 0282 decided readings by class and ADR 0304 took a leaf module to
one, but the gate never learned it: every build, leaf or core, needed
three readings over at least two minutes, so a container module that
was healthy at once still waited about two and a half minutes on its
first machine. The number of readings and the settle time now follow
the module's class: three after two minutes for the controller's own
path and the resolver, one for every other module. Tests that judge a
gate's other rules keep leaf modules on three readings.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A token a media server got from its vendor reached its consumers only as a value the mesh minted, which
the server refused, or as a copy typed by hand. An offer may now say its software issues the credential;
the new issued verb carries no value and asks the provider's tool, in the controller's own name, for the
value sealed to one call, then seals it to every pair that does not hold it yet.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
Assigning the media-importer beside youtube was refused because both
declare ffmpeg. The node-engine installs a missing package and never
removes one a declaration stopped naming, so a second declaration
changes nothing on the machine; what two modules can contradict is one
declaring a package present and another absent, which stays refused.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A line is said with a plain publish, so a live subscriber can hold both
lines while the stream has stored one or none yet; the test read the
stream once and failed under load. It now waits up to 5 s for both.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A periodic report about an identical earlier send names the same digest and
can arrive after a later send the machine never received, so the digest and
the time read it as applied. The digest-and-time rule stays for engines that
report no order. Tests now hold the digest condition and the sequence one.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
The send record of issue 234 is now readable only through the controller's
verbs (issue 506), and only plan said it. status says per machine when it was
last sent a declaration, by whom, from which generation and what it answered;
node show says it in full with the refusal's words. A machine's answer is read
from its report only when that report is about the send and came after it.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
A new batch beside the open one walked an older commit after a newer one, and a
stop that failed partway could leave a merge on two plans. A module shared with
the stopped merge, built at its branch, would deliver it; it is left out or
withheld. A batch not yet cut can drop a merge, so mesh-delivery can stop a
merge walked again. The stopped walk names what it left on which machines.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
One walk carries every merge of its batch, so ending it for one group member
ended every other delivery on it. delivery-stop now takes without: the walk
ends, every other merge it answered is batched again, and each later merge of
a left-out merge's repository is left out too, since it contains it.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The issue tracker's history lasts seven days on the events stream and its
bucket fills toward a cap with no warning (issues 501, 502). A module may
now declare `logs`; the controller creates each as a stream on the bus
(create-or-update, never deleted or recreated, reported when undeclared),
issues it to the owner's assignments in their membership, grants the
runtime exactly the append and direct-read subjects, and raises a
condition when any module's bucket or log reaches 75% of its cap, cleared
below 70%.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A walk left the machine holding the bus out of a gated send whenever a
build waited there for that same gate, so a module's new health tool was
refused by the bus on its first machine and the gate could not pass. The
grants step sends that machine its declaration with every build kept,
before the first machine's send; plans and the change plan say it.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
The test pinned daemon.json to live-restore alone, so every controller check failed once the
docker module gained log rotation as a preference (mesh-catalog #205, #217). It still refuses
dns (ADR 0196) and any key the module does not declare, and checks the log defaults where the
module declares them (novox/hq issue 498).
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A refusal of a send the mesh never recorded went only to stderr; it is now kept
with its sender said to be unknown, and raised. A counter behind the machine (a
store put back) is raised and the condition names push, since the receive loop
must not push. The node's digest and generation are one transaction, and a send
record that fails is said loudly without failing the send. The trigger ignores
an update that changes nothing, and the put-back mark is dropped: a put-back is
composed afresh with the current generation.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A declaration newer in sequence than every other named four fewer modules
than the assignments held, a machine applied it, and nothing the mesh kept
said who sent it or from what view. The store now raises an assignment
generation in the same transaction as every assignment change (a trigger,
so a cascade counts too); a send reads it before composing, carries it to
engines that said they read it, marks a gate's put-back, and is recorded
with its sequence, sender, generation and modules. The would-send is
stamped with what was last sent, so nothing reads behind for it; a refusal
is kept on the send it refused and raised as S20 naming the sender; plan
says what the machine was last told.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
A build wrote .npmrc into its source tree and never removed it, and its clone
recorded the URL's userinfo; a later check's container mounts the workspace as
HOME. The .npmrc and the tree now go when the build ends, clones record their
URL without userinfo, and a check first removes any .npmrc an older builder left.
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
The toolchain container mounts the workspace as HOME, so the credential kept
there, and a clone's recorded userinfo, were readable by any pull request; its
output is kept on the bus for days. The credential now lives in a private
directory outside the workspace only while cloning, clones record their URL
without userinfo, and every line said to the build's log and the verdict
passes a redactor copied from the journal tool (sharing it: issue 471).
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …