mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The store's tools and a machine's image pruning decide from the records, so
the controller says them: artifacts (every recorded artifact, kept and why,
eligible, collected on request), collect (the after-build sweep on demand,
a dry run unless confirmed with a why, recorded as a hand act) and images
(what a machine's declaration names, now and as last sent). The sweep is one
implementation with two sets of bounds.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A module's failed unit now arrives among its resources and raises the
module's own condition, named by the unit. The machine's own failed
units, which no module places, are one warning for the machine listing
them, cleared when none is listed. Nothing a send moved is among them,
so the gate never holds a send on that finding. The statement's units
are kept with the machine's health (migration 0080) and node show says
them.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The group feat/a-machine-joins-through-the-tunnel was refused: the
controller's member moved the build agent, which builds the node-engine
(built by: controller first), and the node-engine goes before the
controller (engine before controller: engine first). Both rules applied
to one pair in opposite directions, and every two-way pair was a cycle.
Rules now have a precedence (hq ADR 0249): a declared after: line, then
what the graph and the change say (built by, version skew), then the
rollout default engine-before-controller. The higher rule decides the
pair, which says what it won over. Rules of one rank both ways are still
refused, as a contradiction naming both rules and how to declare the
order. TestReplay309 replays the group with only what orderOf had before.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
On the control node the store-bound packages of the controller's suite ran
five to seven times slower than on any other holder, and every controller
check that landed there ran past the suite's thirty minutes: a throwaway
store flushing to a disk the mesh's own store, bus and forge keep busy.
A store that lives for one check needs no crash safety.
A holder recreated mid-check left the check's store and bus running, and
the redelivery went to another machine, so nothing removed them: eleven
pairs across four machines. A starting holder has taken nothing, so every
container labelled with an ask of the seat is an earlier holder's.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The rows of novox/hq ADR 0169's table the controller answers for: the
hub's composed tunnel carries a machine whose live token was issued for
its key, drops it when the token expires unused, and nothing is recorded
for something that is not a tunnel key.
token issue --overlay-key records the key the machine made, binds the
token to it, gives the machine its address and makes it a peer of the
hub, pushing the hub before the token is shown. The token carries the
hub's tunnel and the bus at its holder's address on the private network,
and enrolment refuses any other key (novox/hq ADR 0169). The bus is no
longer public, so a machine outside the mesh can join only this way; a
token without a key is still what the machine running the bus joins its
own mesh with. Also a token verb, which says it replaces running the
command by hand and adding a peer to the hub with wg.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Two incidents had one shape: a change took effect that nobody saw first (hq issues 241, 304).
Three guards, each silent when nothing is at stake:
- settings show [--history], and a set that answers each key it adds, changes and removes, and
refuses a removal unless --replace; the replaced or cleared layer is kept in settings_history,
in the same transaction as the write (migration 0078).
- every send keeps a summary of what it sent (no file content), plan <node> --diff compares with
it, and push with no machine is refused unless --all.
- a push that would give a running container's mount another host directory holds that machine,
naming the module, mount and both directories, until push <node> --move <module>; a named push's
cascade is held the same way.
Rebased onto main and fitted to it: the hold runs before the push says what it recreates, a whole
push still says so first and leaves machines waiting for a gate, the verb's push with no machine is
still --behind and a push still needs why. The verbs take plan diff, settings replace and history,
and push move beside a machine, each refused where it cannot take effect.
mesh/delivery held for a person: merged, and the controller opened no walk for it within 10m0s — nothing it holds follows that branch, or the merge was…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The verb took only a repository; build --on <module> and build --behind were reachable only through the generic command verb. Each shape is one per call, and a second beside it is refused as passed over.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
R292: two drills recorded through hand-act record want no healer.
R298: the delivery seat's holder holds it before and after it serves checks,
so neither repository has to merge first.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A recorded build moves only by a person's push (ADR 0242), so that push is
the word its upgrade policy asks for; S15 counted it as a repair and wanted a
healer for split-dns, words and uplink-verbs. The push now reads what it
carries before it is recorded and says so in its kind, and the ten pushes of
2026-10-07 are named so their three warnings clear on the next tick.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery held for a person: merged, and the controller opened no walk for it within 10m0s — nothing it holds follows that branch, or the merge was…
The delivery plan said a merge adding a module builds it, sent nowhere;
the merge built nothing, so the module was never registered and assign
refused it. The merge now asks for the build of every directory it adds,
outside the plan, and the take-in registers it like a hand build.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Only gated sends said which containers a move recreates; a push moved
mail to a new build and recreated a container with a new image without a
word. The push now lists, per machine, every module it moves and what
that recreates, with the same Recreates the gated send uses.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
node-uplink gained its first verbs in #116, both optional while its holders
catch up (ADR 0246). D3 read any verb as one the holder must answer for, and
raised a silent condition on every machine holding the seat. A seat whose
verbs are all optional now asks nothing of its holders' silence.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery held for a person: merged, and the controller opened no walk for it within 10m0s — nothing it holds follows that branch, or the merge was…
A refused step was logged on every 30-second tick with the same words; it is said, and kept,
when it is new. The refusal named the retired "release plan".
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A seat's verb names the shell commands it is the mesh's way to do, and a module says it for its own
tools in its manifest; the tools verb and module list --json carry both, for the mesh MCP server's
search, the agent's instructions and the guard on its shell.
plans said a build queued for minutes had been building for a few seconds: the line counted from
the last save, and every advance saved the plan whether or not it moved, bumping its revision and
saying plan-moved on the bus. The line, status and LATE now count from when the plan entered its
tier with the stalled condition's bound, and an advance that changes nothing writes nothing.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
A plan's gated send for mail carried postgres's and mongodb's new builds
(policy record) to the control node and the anchor on 2026-10-07: a send
composes the machine's whole declaration from the builds the mesh holds,
and the gate only ever looked at modules that roll out. Every send but a
person's push now composes a recorded module from the manifest of the build
the machine was last sent and records that it still carries it; the bus
step moves the bus alone. And each move a gated send carries says how many
of the module's containers it recreates, and whether with a new image or
only their declaration.
A VPN client rewrote the laptop's resolver file and nothing said so. The
engine now states its machine's networking; the controller keeps it with
the machine's health (migration 0077) and raises the rewrite as its own
finding naming the writer, the machine's own faults as machine.<m>.network,
and what several machines cannot reach once, there. The gate waits on a
rewrite it did not make rather than putting back a good build.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
With twelve consumers of the database provision, one provider down would be
twelve conditions for one fault and twelve gates failed for something none of
them did. A consumer's check names the provision it exercises; while the
provider composed for it — its recorded binding, or the machine its credential
comes from — is unhealthy on the record, what that check finds raises nothing
of its own: the provider's condition lists it as waiting and is urgent, and
the consumer's gate waits, past its bound too, rather than putting a build
back. Liveness findings and checks naming no provision stay the consumer's own,
and once the provider is healthy a consumer still failing is raised at once.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/delivery held for a person: merged, and the controller opened no walk for it within 10m0s — nothing it holds follows that branch, or the merge was…
A module could say nothing about what ready means for what it runs, so a web
application with its port open and its requests hanging passed everything for
eleven hours (issue 145). A long-running resource now carries `health` — the
image's own check adopted by name, http, tcp, exec, unit or a module's own tool,
with its timing — refused near its author when it names a port or an address,
an endpoint the module does not declare, a tool it does not serve, a tool check
alone, or a timing outside the record's bounds. It is composed with the endpoint
as the port this machine published it on, and sent only to a node-engine whose
statement says it reads it: an older one would refuse the whole declaration.
The engine is granted its own machine's instance of each health tool. `module
check` warns of every long-running resource without `health`, counts them for
the catalogue, and refuses them from 2026-11-18. A check's findings stay out of
a condition's summary. The node-engine's validator is vendored at its Phase B
commit, so what is composed is judged by the words the engine takes.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
Two ADR 0240 drills recorded with hand-act record --cause drill raised
mesh.hand-acts.drill.healer-wanted. hand-act drill (seat verb drill) records
them as a person's decision; hand-act record now refuses the cause, so the
two recorded before it clear on the next tick and a repair cannot pass for a
drill by the word it gives.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The witness moves a running build aside into a directory the controller's user
cannot enter, then deletes it; a verb exec'd from os.Executable() in that window
failed with permission denied. /proc/self/exe stays valid while the process lives.
A verb that still cannot start, or arrives while the controller stops, is refused
with link.ErrHandingOver and marked retry: handing-over.
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The gate judged a module by what the mesh saw from outside, so a container that
crash-looped after it applied passed it. Each machine's node-engine now states
the health of every long-running resource it runs; the controller keeps the
newest statement per machine, raises module.<module>.<machine>.unhealthy on the
second statement in a row, clears it on the first that does not say it, and the
gate passes a module only when every long-running resource of it is stated
healthy since the send. An engine that states nothing is judged as before.
mesh/merge-gate error: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; the check could not run: a throwaway postgr…
mesh/repo-check error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791331512096605198…
The snapshot promises no address, and every module's repository, reads and sources carried the URL the
mesh clones from. A check matches repositories by owner and name, so nothing it reads is lost (novox/hq
issue 288).
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
The gate composed 0 of 4 machines with the change and without, and passed every change: the store it
raised held each module's bus credential but no account for it (issue 203's refusal), no outward links
(so no filter could be composed), and refused settings the mesh holds. Now the account is minted with
its credential, the facts carry each machine's outward links (a stand-in for an older snapshot), the
mesh's layers are kept as held, and a withheld path keeps a path's shape. A machine the mesh composes
that the gate cannot raise makes the verdict an error, never a pass; the verdict alone is on stdout.
A merge-check.sh that passed on an agent's machine failed on the build seat: a newer gofmt, siblings at
a feature branch, another user. `mesh-controller check-here` runs builder.Check with the ask the
controller would make, from facts that now name the toolchains and the refs cloned beside; a failed
script is said by what failed. (novox/hq issues 282, 283)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check fail: its merge-check.sh failed: FAIL
A walk mesh-delivery never lets go waited for ever with nothing open: S16
says it at 30 minutes, urgent at 4 hours, naming plans go. Phase B: probe
D14 reads the delivery owner's stalled and raises delivery.<id>.stalled,
and H2 takes the table's transition through its close.
While the mesh-delivery seat has a holder on record, a merge that moves no
core module opens its walk and asks nothing until mesh-delivery or a person
says go; nothing of it is registered before its turn, so no other send
carries it. The controller keeps the planner, the gate, sending and the
walk, and gains the verbs the owner asks with: delivery-plan, -order,
-check (a group composed as one future state), deliver, delivery-stop,
delivery-walks; every walk kept is said as plan-moved.
One commit, one plan: a commit off the trunk — a pull request's head, a branch built by
hand, a rebuild or replay of one — is for checking. The build seat reads from its clone
which branches hold the commit, and the controller records and never registers a build
whose commit is not on the branch the module follows (the repository's default for a
new one), so nothing off the trunk can be sent.
A pull request's check now carries its change plan, computed by the planner: what a
merge would build in which order, what each machine would receive, and what is not an
ordinary send — the bus step, a module waiting for a person, a provider's consumers.
touchedBy is now the only mapping of changed files onto modules — touched, added, and
read by no build — and reachOfMerge the planner's whole answer with the dependency walk.
The merge handler, the plan what-if, the merge gate's width and composition, and a pull
request's check all ask it, so planning and gating cannot disagree. The gate composes
the definitions of the modules a merge would rebuild or add, not every one in the tree,
and the check says the dependents a merge would build after them.
The builder reads a module's own directory (the repository for one built from its root)
and a repository its recipe packages, nothing else. A file in no module's directory was
read as shared code and rebuilt everything built from the repository: 103 modules for a
merge-check.sh added at the catalogue's root. It now touches nothing, in the merge
handler, the release planner and the pull request's check alike, and the gate says so.
de-spiegel's and link2pay's manifests already fail the module check on main; without
comparing against the base branch every pull request touching them would fail the gate
for a fault none of them made. The gate's own rule: what was already so is said.
Every pull request the forge announces is mapped onto the mesh's module graph by the
merge handler's rule (issue 278): touching a module — or adding one — runs the gate
(mesh/merge-gate), its judge chosen by the graph (the controller judges itself, the
node-engine by its validator); a repository of the mesh that touches none runs only its
own merge-check.sh (mesh/repo-check), a warning when it has none. Nothing is left pending:
a repository outside the mesh touching nothing is told so as a pass.
The gate moves out of the per-repository scripts into the build seat, so a script is the
repository's own tests and declares its toolchain (go or typescript). The controller's
manifest names every verb of its seat again (ADR 0132), held by a test.
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791318263948250337…
mesh/merge-gate error: the check could not run: a throwaway postgres:17-alpine could not be raised: docker run --label mesh.build=build-1791317509716888018…
An image is not byte-reproducible, so ADR 0236's 'same artifacts is no move'
never held for one: a catalogue merge that did not touch the bus rebuilt it,
and every send to the control node waited for a planned bus upgrade.
The builder now records a source fingerprint per build (module tree, context
trees, bases and toolchains by digest). A rebuild with the fingerprint of the
build it repeats is registered with that build's artifacts, handed to modules
standing on it, holds no push, demands no bus step, and a plan sends and
gates nothing for it. Identical artifacts remain a second way to be no move.