Delivery 1 wrote no commit on the key of a pulled-in module, so after the upgrade those modules fell out of SentBuilds. At the start of the lease holder a copy fills every key that names no commit (creating a standing pulled-in key where none stands), overwrites nothing, empties each column it copied, and raises an urgent condition while it fails. Migration 0105 no longer drops node.sent_builds (issue 1112 does).
The migration raises first unless chain_moved names builds, rollouts and assignments for every kind that holds rows, and unless pending_assignment holds no open or unanswered row; then it drops build_request, build, batched_merge, release_plan, pending_assignment, assignment, raise_assignment_generation(), node.sent_builds and chain_moved. build_gate stays.
Every method of builds, build requests, rollouts, merges and assignments reads and writes the chain alone: the else branches that read the tables, the movers and MoveChain with their tests, chain_moved reads, ChainReads and the flags that switched a kind, the store's assignments mirror (KeepAssignmentPlans needs none of it: it uses only the AssignmentMirrored type, mirrors.go, and AssignmentValues, provisioning.go) and its tick, the move code of the controller's start, and ForTest's chain_moved row. The listed store tests of the move go with their functions; the tests of the readers, requests, assignments and plans that lived beside them stay in chain_store_test.go. Tests that replayed old data migrations over the build, assignment and pin tables are removed with the tables. The static test that no plan is written but through SavePlansMoving now reads the plan's chain path.
SentBuilds answers from the keys of the node's assignments that name a commit, known when the node was sent anything and no key says its commit unknown. A send that names its builds writes the commit, build and rollout on each carried module's key (a module nothing assigns gets a standing key marked pulled-in, never a state) and clears what every other key of the node named; a send by hand writes sent-unknown, a time, on every key and clears their commits. A failed write of these fails the record of the send. node.sent_builds is no longer written. The plan pass ends a pulled-in key only when no send carries it.
A wait that ended unmade and whose condition nobody answered is carried by the wait that replaces it, so the operator is never left without the condition for a module still not on its machine, and taking it back, its condition and the orphan sweep read it there. The condition id stays node.module.<id> with the string id. clearOrphaned says a taken-back wait too. TestAnAssignmentWaitingForItsBuildIsOneKeyOfTheAssignmentsBucket enters through the assign verb and reads the key before and after the build's outcome.
A wait for a build is the value of <node>.<module> with state pending and a pending object (id p-<unix nanoseconds>, a string), so every reader that skips a value with a state skips it, and the controller's own lists skip it through Stands. The transitions are compare-and-set on the key's revision (claim, release, settle, repoint, mark); assigning over a wait carries it into the value that stands, applied when it was waiting; a plan pass never overwrites it; one open wait per machine and module, and a key that holds the module refuses a new one. The table is no longer read or written, ForgetEndedPending is gone (no key is removed), and a wait of a machine the store dropped is none. Callers change type only; their conditions are the next issue.
Review round 2. The writer's leave to write is the lease's and AssignmentsMirrorMayWrite, a flag set before the settle of the assignments' switch, kept after the commit and cleared only if the switch fails, so a pass that read its source before the switch lays and purges nothing after it.
1090/1092: the move tests pick each report by kind and expect three, all already, on the second run. 1090-1093: under the share lock the switch reads the rows again and writes every key whose value differs from its row (and ends an assignment the store dropped) before recording the kind, so an update the old controller made after the first pass is not lost. 1093: route-proxy is pinned at mesh-sdk f185aedb and vendored; the controller uses only the SDK's asks package. KeepAssignmentPlans decides each key by keepStep, which never makes or revives an assignment. AssignmentsMirrorToWrite refuses once the assignments are moved.
The first try of the move to the bus is made before the controller serves, and a failure of the kind that is tried again no longer holds the start: it is tried every half minute while the controller serves from the tables. Moving the assignments looked up the build of each commit by scanning the bucket of builds for each of them; it reads the builds once.
A send that records what a machine was sent writes, in the assignment of each module it carried a build of, the build, what it published, the commit, the rollout that sent it and since when: filled where the assignment names nothing, replaced when the commit moved, never blanked by a push by hand. A plan's sends are made as the plan, so they name it, and the plan lists the assignments each send changed with the build and commit before and after, the builds it carried and the steps taken. The builds, plans and node verbs say the links. node.sent_builds is written and read as before; SentBuilds from the assignments follows with the delivery that drops the column. Acceptance 10 is a test that enters by a merge heard and cut into a plan and writes no key by hand.
ADR 0408 section 4 says no key of the chain is removed, a delete marker included. The Backend loses Remove and the Chain RemoveAssignment. An unassignment, and the end of a value only pulled in by another, write the value again with ended set, by compare-and-set; assigning it again writes a fresh standing value over it. A value with ended or a state is no assignment (Assignment.Stands) to the assignment lists, the joins, forgetting a module, seat holdings, the given values, the move and the assignment-changed event.
Once chain_moved records the kind, Assign, Unassign and Assigned write and read the keys <node>.<module>, and every join of the store that read assignments is made from the bucket: where a module runs, what is behind, what a machine awaits, a given value due for replacement, taking a module, and whether a module may be forgotten (refused while a standing assignment names it). An unassignment ends the key with a marker and keeps its earlier values, as it removed the row; no ended or pending mark is written yet. The generation rises with each change, and a seat held by an assignment goes with it: the foreign key from seat_holding is dropped by migration 0104 and the controller says both. The provisioner's plan is kept in the values by a pass of the tick that writes that one field by compare-and-set; the assignment-changed event is said from what the bucket holds, whoever wrote it. The start moves the rows with what each machine was last sent, keeping a plan the mirror put in a value.
Once chain_moved records the kind, a plan is a key of the rollouts bucket under its id and the open batch is the same key in state assembling. A save refuses a copy another save moved since (the plan's own Revision, kept in its value, counts saves) and keeps the merges the record holds, so a copy read before a merge moved cannot lay it back. The merges a batch or walk answers are the record's held field, with the columns the table had; a merge no plan answers stays, flagged, in the record that held it last, or in the record kept for those. A merge moved to a plan is written to the receiving record first and then taken from the giving one; one found in both is read from the one it entered last and repaired at the next cut. Plans and merges are read from a view kept by one watch of the bucket. A bus that does not answer, a lease lost and a key moved are now not-now like the store being away, so a merge whose plan could not be written is held and handed over again, never acknowledged. The start moves release_plan and batched_merge into the bucket, one kind, counted against both tables.
A request is the build's record under the id its outcome will carry, in state asked; the outcome takes its place and keeps the request beside it, so assign, the pending assignments and the planner read the builds bucket alone. The bucket removes no key, so a request past thirty days is not listed instead of deleted. The move folds build_request into the same records (one kind, builds, counted against both tables) and marks the requests never handed over to be asked again once: claimed before it is asked and settled after, so a crash loses the ask rather than making it twice. Also tests the chain buckets' options on a real bus, the assignments' mirror options included.
Once chain_moved records the kind, RecordBuild and every build read go through the chain (reuse key and published added); before that the tables are read as before. The serving controller copies the rows at its start, holding the lease: idempotent per key, rows counted against keys, the largest value measured, a refusal (urgent condition, nothing switched) on a count that differs or a value over the bus's largest, and a re-read when the table took a row meanwhile. ForTest attaches the chain in memory with builds moved; ForTestBefore leaves it unmoved. Build requests, gates and the other kinds are still in their tables.
internal/chain holds typed Build, Rollout and Assignment and a Backend with no delete or purge, in memory and on the bus. The builds and rollouts buckets are asserted with history 64, no age and values up to just under a mebibyte; the assignments bucket gets the same, keeping its marker age because a stream cannot be made to disallow message ages. Migration 0104 makes the one-row chain_moved switch. The controller keeps no consolidated schema, so 0104 is the whole schema change. Nothing reads the buckets yet.
mesh/delivery stopped: Operator's word (2026-10-18 00:09): split the group. After mesh-catalog #353 merged on the group's Approve (23:48:51), #375's merg…
mesh/repo-check head a39d6ce78d19 merged into trunk 7c9c187ca6e2 — fail: its merge-check.sh failed: --- FAIL: TestADeliveryThatMovesABackedUpModuleWaitsFor…