Commit Graph
300 Commits
Author SHA1 Message Date
mesh-adminandClaude Opus 5.5 f0af09cfc7 Test placement read only from the placement, and raise a store before a migration (issue 651)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-14 00:44:20 +00:00
mesh-adminandClaude Opus 5.5 02b542a059 Keep a layer's placement beside it, and say the layer whole (issue 651)
The settings verb's path splits a layer it is given into its config values and
its placement, so what a person types still works; a layer reads back and goes
into the history whole.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-14 00:42:37 +00:00
jschoubben b0753e2aac Let a drain lapse, bound the gate's wait on the controller's clock, keep a busy wait out of apply time
mesh/delivery superseded: a newer head of the same pull request
mesh/delivery-group group feat/335-a-busy-container-is-replaced-when-idle checking: 1 of 2 member(s) ready
mesh/merge-gate head b0753e2aac95 merged into trunk 72214ae989b3 — pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus…
mesh/repo-check head b0753e2aac95 merged into trunk 72214ae989b3 — pass: its merge-check.sh passed
Review of #283: a drain whose replacement was withdrawn held the agent for
ever with its health green; the gate trusted the engine's until; a machine
of the rest waiting at the bound read as silent and its apply time held the
wait; an unknown mesh-builder word exited 0; plan said nothing of a busy an
older engine is not sent; and a node with a report and no send broke the
reading of every last report (the store test's NULL).
2026-10-14 00:07:31 +02:00
jschoubben a69c0e50dc Merge origin/main into feat/335, and pin mesh-host at #98's new head 2026-10-14 00:01:21 +02:00
mesh-admin 72214ae989 Merge pull request 'One build per change: the check builds what its merge moves, the walk takes it by key (ADR 0350, issue 649)' (#311) from feat/350-one-build-per-change into main 2026-10-13 21:30:25 +00:00
jschoubben 675466a8c3 Hold the store tests' modules as the settle time did, and fault a dip after any healthy reading
mesh/delivery delivered
mesh/merge-gate head 675466a8c35f merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 675466a8c35f merged into trunk bff5b7f0e4f8 — pass: its merge-check.sh passed
Two tier tests relied on the two-minute settle to keep a module unjudged; the
witness window and the gate's spacing now hold it. A healthy reading taken
before the controller's floor counted no pass, so a dip after it did not take
the two-minute pass away (novox/hq ADR 0352 decision 3).
2026-10-13 23:07:15 +02:00
jschoubben cd49b50c40 Build a change once: the check builds what its merge moves, the walk takes it by key
mesh/merge-gate out of date: judged against trunk bff5b7f0e4f8, the trunk is now 372faebf2824; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk bff5b7f0e4f8, the trunk is now 372faebf2824; judged again on a recheck or when it is merged
mesh/delivery-group group feat/350-one-build-per-change checking: composed check out of date: novox/mesh-controller@cd49b50c4075 was judged against trunk bff5b…
mesh/delivery superseded: a newer head of the same pull request
A merge built every moved module a second time although its check had judged
the same tree (issue 649). The check now builds into the scratch namespace
under a reuse key (source fingerprint plus the builder's own digest), and the
walk of the trunk commit copies a build of the same key by digest instead of
building, saying per module why when it cannot (novox/hq ADR 0350).
2026-10-13 23:04:40 +02:00
jschoubben c3946e5d72 Pass the node-engine and resolver on their third reading, at most two minutes
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head c3946e5d72c2 merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head c3946e5d72c2 merged into trunk bff5b7f0e4f8 — fail: its merge-check.sh failed: --- FAIL: TestACoreBehindWhileTheNodeToolsSettleFailsNo…
The operator wants these gates as fast as they can be: counting readings only after
two minutes added about 80 s to every node-engine rollout for no safety. Count
from the send, pass on the third healthy reading, and pass a module healthy at
every reading at two minutes on what it has (novox/hq ADR 0352).
2026-10-13 22:55:46 +02:00
jschoubben 524295926f Pass the controller's first-node gate on one reading after the witness window
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate head 524295926f76 merged into trunk bff5b7f0e4f8 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 524295926f76 merged into trunk bff5b7f0e4f8 — fail: its merge-check.sh failed: --- FAIL: TestACoreBehindWhileTheNodeToolsSettleFailsNo…
The controller runs on one machine, so three readings over two minutes guarded no
other machine and held every walk behind it. Judge each module by its own rule:
one reading for the controller and the tool runner once the node-engine's witness
window has ended, one for mesh-delivery, three for the node-engine and the
resolver with the first two minutes after the send (novox/hq ADR 0351). The
gate's verdict names the rule it applied.
2026-10-13 22:39:32 +02:00
jochen e324f5d821 Send an approved settings layer by a walk at once, so the operator's Approve is the act that takes effect (issue 641, ADR 0344)
mesh/merge-gate head e324f5d82162 merged into trunk 6f1a05366c1d — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head e324f5d82162 merged into trunk 6f1a05366c1d — pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The warrant set the layer and left the push as a second act nobody took: the
operator approved a betterbird change on Telegram and nothing reached g14.
Now the warrant opens a settings walk: the machines the layer reaches, one at
a time, the module judged on each at its gate, its end told once through
plan-moved. The ask and the proposer's answer say so instead of naming push.
2026-10-13 16:39:47 +02:00
mesh-admin 6f1a05366c Merge pull request 'Admit a port from the machine's own local network, and never a public subnet (issue 154, ADR 0340)' (#299) from fix/154-local-network into main 2026-10-13 13:07:11 +00:00
jochen c9dd07f919 Never make a credential only a person can give, and give it once per provider (hq issue 164, ADR 0337)
mesh/merge-gate head c9dd07f919a2 merged into trunk 404b4409e70e — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head c9dd07f919a2 merged into trunk 404b4409e70e — pass: its merge-check.sh passed (run 2)
mesh/delivery delivered
A Servarr app's API key, an indexer's key and a downloader's password are values the provider's
software holds; the pair path made a random value for every consumer of them, sealed it to both ends
and reported success, and the provider refused it. An offer may now say `"credential": {"issued-by":
"outside"}`: SecretFor never makes a value for it, the plan reads such a pair as given or not given
and sends the consumer no credential file until a person gives it, without refusing its machine;
remakeShared and SharedSecretFor never make a provider's own secret issued outside either.
`secret accept <provider's node> <provider module> <provision>` seals one value to every consumer that
binds the provision from that provider, the provider and the operator, under one generation; the
per-pair form is refused for such a provision, and rotate names the accept. A consumer may wait for a
provision's credential: the controller excuses the wait only when the store bears it out, and its
needs-operator condition names the one accept line.

Adds the replay of issue 164 (TestReplay164), written with only what the controller had before.
2026-10-13 11:37:31 +02:00
jochen 6e6cd5e26d Admit a port from the machine's own local network, and never a public subnet (issue 154, ADR 0340)
mesh/delivery-group group fix/154-local-network checking: 0 of 2 member(s) ready
mesh/merge-gate out of date: judged against trunk 1826b68a22b5, the trunk is now 404b4409e70e; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 1826b68a22b5, the trunk is now 404b4409e70e; judged again on a recheck or when it is merged
mesh/delivery superseded: a newer head of the same pull request
A local service could only be declared public, which says the internet. local-network is a source and a reach: the private network and the private networks the machine reported on a link facing outside, judged here, shown by plan and node, and said in the rule set when there are none.
2026-10-13 11:20:22 +02:00
jochen e658a14296 Read a built module's build edges from what is kept of it, so a new SDK rebuilds its toolchain and bundles (hq issue 614)
mesh/merge-gate head e658a14296f9 merged into trunk 1826b68a22b5 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head e658a14296f9 merged into trunk 1826b68a22b5 — pass: its merge-check.sh passed
mesh/delivery delivered
A registered manifest carries no build, so mesh-tools' build.on naming the
SDK's package and every bundle's toolchain were edges only before a module was
first built: mesh-sdk 0.1.14 planned "sent nowhere". The relation now reads a
package base from the recorded name@version against the package the mesh holds,
and the toolchain from the bundles the resolved manifest keeps. Only records the
mesh already keeps are read, so it holds for every module built before it and a
rollback reads the same records. Replay R614.
2026-10-13 11:08:17 +02:00
jochen 05576db018 Say which modules a walk left unchanged, so a merge that moved nothing is not read as stranded (hq issue 611)
mesh/merge-gate head 05576db018a4 merged into trunk a688dcff394b — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 05576db018a4 merged into trunk a688dcff394b — pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group fix/611-an-unchanged-build-is-delivered delivered: every member is delivered
A delivery plan made while another walk built a module reads it whole and names it; the walk, cut later,
finds none of the changed files in the build source that build recorded and moves nothing. Its record named
no module, so mesh-delivery read 'matched what runs' as 'never built', stopped the delivery and asked the
operator about a change already on every machine. The walk now says each such module in delivery.unchanged,
with why; its modules keep meaning what it builds.
2026-10-13 08:18:19 +02:00
jochen 18221c4079 Judge ADR 0326 §3 only where a definition is written (hq issue 574)
mesh/merge-gate head 18221c4079d1 merged into trunk 7b2a9eae8020 — pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every …
mesh/repo-check head 18221c4079d1 merged into trunk 7b2a9eae8020 — pass: its merge-check.sh passed
mesh/delivery delivered
ParseManifest also reads stored builds again: a build's manifest at a
commit, the gate, a release, a module put back. betterbird's builds from
before its accounts file named its keys would have become uncomposable
there, so a send to g14 or shanks could fail and a rollback be refused.
The refusal now runs in module check, module add, a build taken in, the
builder and the merge gate's registration, and a file is no longer
reported by both §2 and §3.
2026-10-13 00:54:26 +02:00
jschoubben b1546ed28a Hold a walk's first-machine gate while its busy container finishes its build
mesh/delivery superseded: a newer head of the same pull request
mesh/delivery-group group feat/335-a-busy-container-is-replaced-when-idle rejected: its order contradicts itself: novox/mesh-catalog@190608193764, novox/mesh-c…
mesh/merge-gate out of date: judged against trunk 56d6313262e8, the trunk is now cbac703e817d; judged again on a recheck or when it is merged
mesh/repo-check out of date: judged against trunk 56d6313262e8, the trunk is now cbac703e817d; judged again on a recheck or when it is merged
A merge into mesh-controller replaced every build agent and threw away the
checks in flight (issue 594). The manifest's container busy is checked and
sent only to an engine that reads it; a report's busy waits are kept, the
gate starts at the report that says the container replaced, and the wait is
a phase of the delivery time. mesh-builder busy drains the agent and answers
while a build is in hand (novox/hq ADR 0335).
2026-10-13 00:53:10 +02:00
mesh-admin 56d6313262 Merge pull request 'The controller's check stops waiting on fixtures and fixed intervals (issue 591)' (#279) from fix/591-the-controller-check-runs-in-minutes into main 2026-10-12 22:22:24 +00:00
jschoubben 7f3ff32361 Give a fast-renewing test lease a serving controller's time to renew, and prove the minted hash's cost
mesh/merge-gate head 7f3ff3236149 merged into trunk 21ac8fd8586d — pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus…
mesh/repo-check head 7f3ff3236149 merged into trunk 21ac8fd8586d — pass: its merge-check.sh passed
mesh/delivery delivered
A renewal timed out at the renew interval, so the lease test's 1 s renewals
could lose the lease on a slow build machine (novox/hq issue 591, review of #279).
2026-10-13 00:08:48 +02:00
jschoubben 7892019d9e Copy each store test's database from a template migrated once, and hash test bus passwords at bcrypt's least cost
Running ~90 migrations into a fresh database per store test, and bcrypt at
the default cost under the race detector, were most of the controller's
check (novox/hq issue 591).
2026-10-12 23:53:06 +02:00
jschoubben e727589e48 End a walk's apply phase at each machine's own report of its send (hq issue 582)
mesh/merge-gate head e727589e483b merged into trunk 961f2e82ea1c — pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus…
mesh/repo-check head e727589e483b merged into trunk 961f2e82ea1c — pass: its merge-check.sh passed
mesh/delivery delivered
The walk records its send to the rest only after every machine was sent,
which takes 20-28 s, so the machine sent first fell outside the 2 s slack,
its report was missed and the phase ended at the next walk's send to it.
Keep each machine's own send time with what it was sent, match its apply
duration by that send and digest, and show each machine's report in the
walk's phases (ADR 0282 decision 6).
2026-10-12 23:18:28 +02:00
mesh-admin 2f157148c6 Merge pull request 'node shows what a machine said it is made of, with its age (issue 160)' (#269) from fix/160-node-shows-what-a-machine-is into main 2026-10-12 20:37:06 +00:00
mesh-admin f8daec01d3 Merge pull request 'Read a plan by its id as a parameter, never as SQL (issue 561)' (#268) from fix/561-plan-id-parameter into main 2026-10-12 16:37:07 +00:00
jochen 7953d2889d Show what a machine said it is made of in node, with its age (issue 160)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The architecture and kernel a machine reported were kept and read by nothing, and the facts the
node-engine now says (memory, filesystems, processor, distribution, virtual or physical, uptime,
timezone) would have joined them. node shows every one in one block with the age of the account,
and a fact the machine could not determine as unknown with its why, never as a zero.
2026-10-12 17:23:07 +02:00
jochen edd33f21d2 Make no value for an own secret issued outside the mesh that nobody gave (issue 401)
The send minted a random value for a plain own secret marked issued-by outside and placed it, so a
module could not tell "not given" from "given and wrong" (ADR 0228). It now places only a value a
person gave: not given is no file, an empty value where a module's file names it, and nothing to
restart on, as ADR 0283 decided for a family's member. A value the mesh made for one earlier is not
read as given.
2026-10-12 17:15:12 +02:00
jochen e9f060e0be Read a plan by its id as a parameter, never as SQL (issue 561)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
PlanByID pasted its id into the query, and the id comes from a caller of
the plans verb: an id holding a quote changed the query (x' or '1'='1
answered another plan). The id is now $1, and RecentPlans's limit too, so
no plan query is built from a value.
2026-10-12 16:33:23 +02:00
mesh-admin 4b1dee6b79 Merge pull request 'A merge that shares nothing with the assembling batch, and whose group waits for no one, is cut at once (hq issue 525, ADR 0304 §1, ADR 0306 §2-3)' (#250) from feat/525-a-lone-merge-skips-the-window into main 2026-10-12 11:46:59 +00:00
jochen 1e9dcf0667 Say every walk a verb keeps, and clear a stop from a walk that walks again
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
cancel, clear and rebuild kept a walk's end or restart without saying it, as plans stop, retry and
release-backlog did before them. The controller's run now says every save a verb makes on the bus, so the
next verb cannot lose a mark the same way. A stop is cleared when a walk is resumed, so one that fails again
ends failed and the search for its merge runs (review 21, ADR 0308, issue 532).
2026-10-12 12:54:20 +02:00
jochen cd6610cdf7 Say a walk's start or end when a person stops, closes, retries or releases it, and a hand stop as stopped
plans stop|close, plans retry and upgrade release-backlog kept a walk's start or end mark without saying it,
so the router would hold what the walk touched until its bound; each now runs on the bus as plans go does.
A hand stop keeps who stopped it, so its outcome is stopped, not failed (review 15, ADR 0308, issue 532).
2026-10-12 12:54:20 +02:00
jochen facc551ff2 Say what a walk touches, its bound and its outcome when it starts and ends (ADR 0308, issue 532)
The router holds what an open walk touches and tells its result once; it can do so
only if plan-moved names the walk's start and end, the modules and machines it moves,
what a moved tool runner or node-engine carries there, and how long to hold.
2026-10-12 12:54:20 +02:00
mesh-admin fafa3fd9ef Merge pull request 'Require the service manager's reset-failed, wanted-by and unlink-dangling verbs (issue 332)' (#248) from fix/332-require-service-manager-verbs into main 2026-10-12 10:53:20 +00:00
jochen 61d00a234a Give the store tests' service manager holders the three verbs it now must serve (issue 332)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
They named only the eight verbs from before issue 332 and were refused once the seat required
reset-failed, wanted-by and unlink-dangling.
2026-10-12 12:25:05 +02:00
jschoubben 4d203b5a5d Ask mesh-delivery whether a merge's group still assembles (hq issue 525)
A merge from any head waited for the window because the controller could not
see a group's members, so the window skip changed nothing in production and
unrelated merges walked one after another. The controller now asks
mesh-delivery's groups, within 3 s and before the plans are held: a merge
waits only when its head's group has another member whose pull request is
open and whose merge it does not keep yet (ADR 0306 §2). No answer means it
waits, and its batch says why. A headed merge in no waiting group and related
to no batch is cut at once, as one from no head is (ADR 0304 §1, ADR 0306 §3).

The controller's grant names mesh-delivery.groups. The installer's first user
list in mesh-host must carry it too before the genesis test can pass.
2026-10-12 12:14:46 +02:00
jschoubben 6196a4815e Let a merge that shares nothing skip the merge window (hq issue 525)
A merge waited the whole window even when nothing assembling shared anything
with it. It now joins only a batch it is related to (ADR 0304 §1, read by ADR
0306 §3: repository, a module the cut would move, a graph edge, a group head),
folding the newer into the oldest when it relates to two. A merge related to
none starts a batch whose window is closed at once (PlanBatch.CutAtOnce),
unless its delivery group may still have a member to merge (ADR 0306 §2).

The controller cannot see a group's unmerged members (that is mesh-delivery's
record), so a merge from any head still waits, in a batch of its own: the safe
error is to wait. Walks stay one at a time; a batch cut at once queues behind
an open walk. A stop's merges walked again join a related batch, or their own.
2026-10-12 12:14:46 +02:00
jochen dcdafd37f0 Keep a condition's looks in the store, so a look that changes nothing writes no bucket (issue 420)
mesh/delivery delivered
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
Every look rewrote the condition's value in the conditions bucket, because the
value carried the count of looks, the last look and the newest evidence: 131 647
writes in four days for twelve open conditions, against ADR 0289's rule that a
bucket is written only when what it describes changed. The looks now live in the
controller's store (migration 0095, condition_looks), the bucket holds what a
condition says and is written only when that changes, and the conditions verb and
the condition events put the looks back.
2026-10-12 12:11:13 +02:00
jochen 6b77dd96f4 Merge remote-tracking branch 'origin/main' into adr-0297-module-logs
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
2026-10-12 02:29:00 +02:00
mesh-admin eba0a301cc Merge pull request 'Judge a leaf module on one healthy reading, a core module on three (hq issue 524)' (#240) from fix/524-judgement-by-class into main 2026-10-11 23:52:00 +00:00
jschoubben 4ee131e990 Let the controller ask an issued credential's tool in its own name, and seal it again over a remade pair (hq issue 526, ADR 0305)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group feat/526-a-provider-delivers-what-its-software-issued delivered: every member is delivered
The bus left the controller out of the caller-named grants, so issued could never reach plex's tool; the
controller is now granted exactly the tools of offers whose software issues the credential, composed from
the records, so the installer's first user list is unchanged. A pair remade on a key change or accepted by
hand kept the issued stamp and was never sealed again; those writes now clear it.
2026-10-12 01:21:20 +02:00
jschoubben faf8b76b84 Cite ADR 0305's clauses by their accepted-for-review numbers (issue 526)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
2026-10-12 01:09:26 +02:00
jschoubben ad3b4f185b Judge a leaf module on one healthy reading, a core module on three (hq issue 524)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery superseded: a newer head of the same pull request
ADR 0282 decided readings by class and ADR 0304 took a leaf module to
one, but the gate never learned it: every build, leaf or core, needed
three readings over at least two minutes, so a container module that
was healthy at once still waited about two and a half minutes on its
first machine. The number of readings and the settle time now follow
the module's class: three after two minutes for the controller's own
path and the resolver, one for every other module. Tests that judge a
gate's other rules keep leaf modules on three readings.
2026-10-12 01:08:14 +02:00
jschoubben db86dd52c8 Take a provider's software-issued credential from the provider, sealed (hq issue 526, ADR 0305)
mesh/delivery-group group feat/526-a-provider-delivers-what-its-software-issued rejected: a member's own check failed
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
A token a media server got from its vendor reached its consumers only as a value the mesh minted, which
the server refused, or as a copy typed by hand. An offer may now say its software issues the credential;
the new issued verb carries no value and asks the provider's tool, in the controller's own name, for the
value sealed to one call, then seals it to every pair that does not hold it yet.
2026-10-12 01:07:16 +02:00
jschoubben 0fb7de7ef8 Merge remote-tracking branch 'origin/main' into feat/459-a-stop-re-walks-the-others
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
mesh/delivery-group group feat/459-a-stop-re-walks-the-others delivered: every member is delivered
# Conflicts:
#	testdata/store-tests
2026-10-11 21:06:47 +02:00
jschoubben e2801773c3 Take an ordered engine's report as a send's answer only by its epoch and sequence (novox/hq issue 485)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery delivered
A periodic report about an identical earlier send names the same digest and
can arrive after a later send the machine never received, so the digest and
the time read it as applied. The digest-and-time rule stays for engines that
report no order. Tests now hold the digest condition and the sequence one.
2026-10-11 20:44:54 +02:00
jschoubben fae6bd0a87 Say each machine's last send in status and node show, and as fields in status --json (novox/hq issue 485)
mesh/delivery superseded: a newer head of the same pull request
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
The send record of issue 234 is now readable only through the controller's
verbs (issue 506), and only plan said it. status says per machine when it was
last sent a declaration, by whom, from which generation and what it answered;
node show says it in full with the refusal's words. A machine's answer is read
from its report only when that report is about the send and came after it.
2026-10-11 20:40:48 +02:00
jschoubben 201bd28278 Keep a walk's withheld modules on its record, name every machine a stopped send reached, and list the stop's store tests (review of #232)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check fail: its merge-check.sh failed: 3 store test(s) listed in testdata/store-tests did not run and pass against the store
mesh/delivery-group group feat/459-a-stop-re-walks-the-others rejected: a member's own check failed
mesh/delivery superseded: a newer head of the same pull request
2026-10-11 20:25:20 +02:00
jschoubben 949990f5a8 Merge remote-tracking branch 'origin/main' into feat/459-a-stop-re-walks-the-others 2026-10-11 20:23:12 +02:00
jschoubben 309475bf6f Walk a stopped walk's merges again in the open batch, in one act, and say what stays on the machines (review of #232, hq issue 459)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: THE CHANGE ALTERS ITS OWN CHECK (merge-check.sh): main's version judged it; the change's judges the pull requests after it merges; it…
mesh/delivery-group group feat/459-a-stop-re-walks-the-others ready: every member ready, and composed together they pass
mesh/delivery superseded: a newer head of the same pull request
A new batch beside the open one walked an older commit after a newer one, and a
stop that failed partway could leave a merge on two plans. A module shared with
the stopped merge, built at its branch, would deliver it; it is left out or
withheld. A batch not yet cut can drop a merge, so mesh-delivery can stop a
merge walked again. The stopped walk names what it left on which machines.
2026-10-11 20:12:27 +02:00
jschoubben fbfdded74b Let delivery-stop leave merges out and walk the others again, so a group stop ends only its own change (hq issue 459, ADR 0299)
mesh/merge-gate pass: builds build-agent, mesh-controller → ace, g14, novox, shanks; no bus step; every machine composes with the change as it did without …
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery-group group feat/459-a-stop-re-walks-the-others ready: every member ready, and composed together they pass
mesh/delivery superseded: a newer head of the same pull request
One walk carries every merge of its batch, so ending it for one group member
ended every other delivery on it. delivery-stop now takes without: the walk
ends, every other merge it answered is batched again, and each later merge of
a left-out merge's repository is left out too, since it contains it.
2026-10-11 19:54:12 +02:00
jochen 7bd61332cb Let a module declare a log the controller creates and never removes (ADR 0297)
mesh/merge-gate pass: builds build-agent, mesh-controller, route-proxy → ace, g14, novox, shanks; no bus step; every machine composes with the change as it…
mesh/repo-check pass: its merge-check.sh passed
mesh/delivery superseded: a newer head of the same pull request
The issue tracker's history lasts seven days on the events stream and its
bucket fills toward a cap with no warning (issues 501, 502). A module may
now declare `logs`; the controller creates each as a stream on the bus
(create-or-update, never deleted or recreated, reported when undeclared),
issues it to the owner's assignments in their membership, grants the
runtime exactly the append and direct-read subjects, and raises a
condition when any module's bucket or log reaches 75% of its cap, cleared
below 70%.
2026-10-11 19:22:43 +02:00
jschoubben 538c4d5115 Merge main (#227) into the grants step's branch 2026-10-11 19:10:09 +02:00