The lead's answers H-A-795 to H-A-803 and the two records accepted tonight are written where they land: the recreate
that empties nothing (869, design 25's checks), a moved mover's pipeline (856, 860, H 746 and 748, test 112), the
runner's bundle files behind a node-engine capability (844), large values as objects (850), the seat value's form
(858), the ledger's own repairs and per-node acts (867), binding on membership-changed (836) and owed events in memory
and in order (832). Every other finding is answered in its line, citing what settles it. Section 10 moves to its own
file and H2b's lines outside the assigner to two files, so each part stays within 60 KB; tests 113, 120 and 121 get
positive live lines and test 122 is added.
The reader's refusal at decode is dropped and validate refuses a form raise no edge covers (858); the tidiness
check moves to the Go build module's unit step, where the toolchain and the registry are (866); a whole-ledger
repair's fold is bounded by repair-memory-mib, and the gate's start pass waits on the acts' repair-ended, the gate
joining H2b's row for that line alone (867). The H2b row and the glossary's form follow.
Round 3 of H2b's design. The lead's answers to the writer's round-2 questions become lines 856 to 868 (a withdrawn
build ends superseded, bridge_owed by pull request, a reader's declared form, the race detector per module, the pin
specification's seven owed changes, a whole-ledger repair as an act, mesh_wait's at) and amend 844 (the tool
runner's bundles in a file per module, never its unit). Rows 50 and 54 leave H2b on the operator's answer of 22:53
(H-A-787), and section 10's milestone column says so. Every cited row carries its first words and the file says how
rows are counted (H-A-788). The glossary gains package pin and form of kept data; the lead answers lose the retired
word console, which the words test refused.
A tier-late end left every later tier unwritten for good, and a later pipeline that
carried the same build wrote nothing, so one put per placement was the only recovery.
The operator said yes at about 21:16 CET on 2026-11-26. ADR 0691 then ended the
outside-wait ask for a module that runs its wanted build. At about 22:15 the operator
put everything queued for H2b into that one release (H-A-775, H-A-776). Each line says
"Built in H2b".
- H §824 to §835 (H-2, the assigner):
- a tier found late goes on once it runs;
- a later pipeline writes the want of a mover at the same version, when the earlier
pipeline never wrote it;
- a mover with no version takes the version released at its fingerprint;
- ADR 0691's ask and timer, and note 68's faults (b), (a) and (d);
- a refused event is owed and said again (H-A-777);
- assigner_put's "newest", and its 12-digit fingerprint;
- a version paired by its parts, in the runner and the assigner (note 69 (3)).
- H §836 to §855 (new part H2b-the-lines-h2-left.md):
- the event hub binds every kept stream it registers, or says each one it does not
(note 70 (3)), and the never-bound backlog goes once (H-A-58, §765);
- a run-once or scheduled module has no program durable (note 70 (4));
- H-A-336, H-A-348, the noted-for-H2b answers, and section 10's rows 41 to 102 that
are still owed, each with its module.
- What needs no line, and eleven questions for the lead, are listed in the part.
- The H2b row in the milestone table names every module these lines touch.
- In place: §750, §751, H-A-75, H-A-277, H-A-627 and G §706 now say what holds.
- Acceptance tests: 113 grows; 120 and 121 are new.
- Glossary: `tier` is a step of a pipeline's delivery order; `tier-late` follows.