mesh/check pass 0c216d99d0c0 on 9d9dfda19b7e | unit 2181 run, 2147 kept, 5 skipped | integration 2203 run, 2166 kept, 9 skipped | over bound: unit, in…
A pull request found merged only by its absence from the open list went through PullMerged, which moved every
other open delivery of its repository back to an old trunk (ready ones to proposed, composed checks out of
date), dated the merge now, and so let a later catch-up write the old commit into source.main. pullMerged now
takes such a merge as late: its own delivery is merged and its group closed, no other trunk moves, its time is
the forge's or none, and LearntLate keeps it out of source.main in finish, settleForgeMerges and the catch-up.
The gitea tool gitea_commit_statuses now answers the pull request's merged_at, and the gate reads a gone pull
request by its number alone, so a deleted branch does not fail the read.
The conditions the gate now says would otherwise be wrong three ways:
- A pull request closed or merged on the forge with no event heard stayed ready here for days (de-spiegel #4,
closed 2026-10-17) and would raise a condition. After a complete read of the open list (shorter than the
forge tool's 1000), each delivery not final whose pull request is missing is read from the forge and taken as
its close or merge; a merge learnt so does not move source.main, as it is undated and could move it back.
- A line that comes due on the clock (a state's bound, the author's bound, an answered refusal, an
out-of-date refusal turning urgent after 10 minutes) waited for an unrelated event. The gate now asks a look
at the earliest such time.
- After a restart the heads waiting on the forge start their bound again, so their conditions were cleared and
raised again later. A condition is cleared only once the open list was read since start, and not while the
forge still shows its head open and waiting.
Also: an empty path list ranks with a truncated one in the merge order, and a seat that keeps refusing
conditions is retried on the clock 10 looks in a row, then at events only, said once in the log.
Met again 2026-10-25: group fix/puller-wakes-on-capacity was merged half. Three causes in the gate:
- The next member's turn compared the group's state with "delivering", a word GroupState no longer says
since release 6 renamed it "merging" (ready.go groupTurnToMerge). Once the first member's merge was heard
from the forge the group read merging, and the second member waited for ever. Group states are now named
constants, the turn goes on in ready and merging (groupMayMerge), and a test holds every word to it.
- Members merged in id order, so mesh-catalog went before the mesh-sdk commit it pins. membersOf now orders
by mergeRank: mesh-sdk first, then members that change no go.mod or go.sum, then those that do.
- No condition was raised: the controller's self-check that read `stalled` went with release 6
(mesh-controller dc456d56). The gate now says its stalled lines as conditions itself on the
operator-channel seat (ADR 0437 §9) after every look, clears those listed no more, and keeps which it
raised in its new bucket conditions. A held group's line says "half merged" when a member merged.
A pass held for a required status no longer retries on a timer: the status turning success is the event
that asks the merge again.
g14's Go builder sat idle at capacity 2 because nothing woke its parked
puller. mesh-build-go, mesh-build-node and mesh-build-image now pin mesh-sdk
b9911dc1, whose puller watches the config value capacity as mesh-config
resolved it and wakes on each change, and hand it that watch.
mesh/check pass 1cc54959afcf on a85d90374195 | unit 1994 run, 2322 kept, 5 skipped | integration 2016 run, 2341 kept, 9 skipped | over bound: unit, in…
Resetting Nextcloud's brute-force record for the docker gateway cleared it for
every client behind that address: someone guessing passwords could drive the
throttle to 429 and have the module's poll wipe it. A throttle is no evidence
the password is wrong, so a 429 is now backed off only, and the back-off
outlasts the throttle. The account's existence is read from user:info's exit
status, since user:list pages.
occ's user:info says 'user not found' on stdout with an empty stderr, so the
error read as 'occ produced no output' and mesh-admin was never made on novox:
occ now says stderr and stdout both, and existence is read from user:list.
The repair could reset whatever account the user setting names, the
operator's included, and the 'admin' fallback is a hand-made install's human
administrator: only mesh-admin is repaired now, and it is the default. The
shares poll needs no admin rights, so the account gets no group. After a
repair the throttle of the caller's address is reset, and a failing repair
reaches the back-off's one loud line with occ's message.
Right after the delivery the first answer may be Nextcloud's 429, not a 401;
without a repair then the account would never be made and the back-off would
wait out a throttle that cannot end.
The image creates NEXTCLOUD_ADMIN_USER only on a fresh install. novox's
instance was installed before the mesh adopted it, so mesh-admin was never
created there, and the shares poll asked Nextcloud every minute with a login
that cannot pass: 401, then Nextcloud's brute-force throttle (429), which
also held the backup before a delivery.
On a refused login the client now adds the account through occ (admin
group), or sets its password to the module's own secret, passing it by
OC_PASS so it is on no argv, and asks once more. A refusal that stays is
said once and the poll backs off from 5 minutes to an hour instead of nine
lines of XML every minute. An empty setting no longer becomes an empty name.
mesh/delivery-group group fix/1901-package-cause held: a member is held: novox/mesh-catalog@155124b59af4 (merged without a passing check: only a person decides…
mesh/check pass 155124b59af4 on f27f4c8cd58c | unit 2015 run, 2883 kept, 5 skipped | integration 2037 run, 2978 kept, 9 skipped | over bound: unit, in…
An indented log line of another running test that held 'panic:' won over the
real timeout panic, since the lines were trimmed before matching. Go prints
the runtime's lines at column 0; a test's log is indented.
mesh-controller's try was worded 'PASS' again because the race detector
reported after the tests passed and the program exited 66. The cause is now
the race: its access, the frame that made it and where its goroutine was
created, instead of PASS or testing's generic 'race detected during execution
of test'. Tests from captured go test -race -json (1901/AC4).
A try of mesh-controller kept 'PASS' as its only failure: the package's test
program stopped after printing PASS and the package-level failure took its
first line. Now a failure that is not one test's assertion names the tests that
were running and carries the panic line (a timeout's with its running tests),
a signal or fatal error line, a build's first error, or words saying the
program exited during which tests or after they passed; go test's summary lines
are never kept. Tests from captured go test -json of eight real failures
(1901/AC4).
mesh/delivery-group group fix/r6-node-composition held: a member is held: novox/mesh-sdk@10b6e202320f (merged without a passing check: only a person decides wh…
Release 6 deletes the plans: the walk half of the holder, the controller port, the carry-over of the former module and the verbs times, what-if, release, stop and retire-history go; the table holds proposed, ready, rejected, merged, held and closed; the delivery's status and view name the source revision the merge moved.
mesh/check failed: shanks: novox/mesh-catalog#473: modules/mesh-build-go/go.mod names mesh-sdk 19c1d35939bc, which is neither on mesh-sdk's trunk nor …
mesh/check pass 40da368ee34e on ee216e4e63f1 | unit 246 run, 4189 kept | integration 228 run, 4249 kept | over bound: unit, integration (slowest unit …
mesh/check failed: shanks: novox/mesh-catalog#473: modules/mesh-build-go/go.mod names mesh-sdk bc0c25e51052, which is neither on mesh-sdk's trunk nor …
The checker takes a repository's trunk head only from the gate's source.main. On 2026-10-24 gitea's
restarted poll announced mesh-catalog #471's merge while the gate was starting and could not yet tell
whether it held the seat; the gate acknowledged the event unread. It then adopted the controller's walk
of the merge commit, which carries no merge time, so every older merge of the repository looked newer
and source.main was never moved: #472 was checked on the trunk before #471 and its merge refused.
- An event heard before the gate can tell whether it holds the seat is offered again, not taken.
- An adopted merge is dated by its walk's creation, so it settles into source.main as a forge merge does.
- Each time the gate comes to hold the seat it weighs the newest merge of each repository against
source.main once more, so a merge marked there and never written (as #471) is written; never backwards.
At 12:37 on 2026-10-24 node-tools on novox was replaced; gitea's watcher bundle awaited the webhook's set-up on the forge's admin API at the top of its import, outlasted the 10 s handshake and was killed, never to start again. gitea_commit_status, gitea_merge_pull_request and gitea_events were then served nowhere: the forge bridge's calls found no responders and no new pull request was announced.
mesh/check pass 75156fce007e on c65116178720 | unit 246 run, 4192 kept | integration 228 run, 4252 kept | over bound: unit, integration (slowest unit …